II. ZoneEx Plan - Instant Connection & Supply

 

ZoneEx Plan: Electric Panel → 5-pole extension cable → Zone Box → 3-pole extension cable → service floor boxes / end user electric / electronic facilities

 
  1. Starts from electric panel
    The modularized ZoneEx plan starts from the electric panel at each floor of a building.

    1. 5-pole connection cables – socket ZEC 453 (standard  length 50 cm) connects at electric panel. Each connection cable extend and serves one Zone Box individually.
       
    2. 5-pole extension cable plug/socket ZEC451 (standard length 12, 8, 3 meters): connect at ZEC 453, and to extend to Zone Box.
 
  1. ZoneEx for general office
    Capacity of ZoneEx -- power extension to workstations and office
    1. Capacity: One 5-pole extension cable extends to 1 Zone Box, which to serve 6 floor boxes.
       
    2. Zone Box: each Zone Box has six 3-pole sockets, to accommodate 6 floor boxes. Each floor box: has 4 sockets, normally to serve 1 or 2 workstations depends on the user's capacity requirement. Based on 1 floor box serves 2 workstations, 1 Zone Box will be capable to serve 12 workstations. Assume each workstation shares 8 sq. meters office space (including aisle and meeting room), coverage of one ZoneEx will be 96 sq. meters. For a general guideline, per ZoneEx serves avg. 50 ~ 100 sq. meters of office space.
 

    For example, in planning an 1,000 sq. meters office, may require 10 up to 20 ZoneEx, which extend power for 60 up to 120 service floor boxes depending on density of the workstations.

  1. 5-pole connection cable to electric panel
  2. Zone Box
  3. 3-pole connection cable to floor box
  4. floor box
 
 